Owner's representative for turbine test, MRO, and advanced manufacturing facilities

Albers Management represents owners planning and delivering gas turbine and aero-engine test facilities and advanced manufacturing plants, and brings the same owner-side approach to maintenance, repair and overhaul (MRO) facility expansions. Our owner's representative work includes a $1B+ advanced high-altitude and hypersonic test facility, the modernization of aircraft engine test stands and test-site infrastructure, and a $500M+ modernization of precision aviation manufacturing space.

We sit on the owner's side of the table: defining requirements, separating and coordinating test equipment and facility scopes, controlling cost and schedule, and planning work around live production and test operations through commissioning and turnover.

Discuss Your Project

What we deliver

Test cell and test stand facility delivery

We help owners plan and deliver new engine test cells and the modernization of existing test stands, test buildings, and site infrastructure. That includes requirements capture, business-case and board-approval support, design and contractor procurement, and owner's representation through construction and acceptance.

MRO facility expansions and modernization

For maintenance, repair and overhaul operations, we define the capacity and workflow requirements, phase construction around shop throughput, and coordinate cranes, specialty process areas, utilities, and supporting space so expansions can be brought into service without disrupting committed work.

Owner-furnished equipment (OFCI) coordination

Test systems, production equipment, and other owner-furnished items need clear interfaces with the building. We coordinate vendor data, installation requirements, utility connections, rigging and access, and delivery milestones, and we can structure procurement so test-equipment design and supply are contracted separately from facility design and construction, with Albers acting as the owner's integrator.

Utilities and power

Test and manufacturing facilities depend on reliable electrical service, steam, compressed air, cooling, fuel systems, and process gases. We coordinate utility capacity studies, central utility plant upgrades, and infrastructure workstreams so they are sequenced with the equipment and construction they support.

Operating-plant interface

Much of this work happens inside active plants and test sites. We coordinate the owner's access, shutdown, sequencing, security, and safety requirements with the delivery team, and plan tie-ins, outages, and demolition around production and test schedules.

Project controls, schedule, and cost

Integrated cost, schedule, risk, and change reporting gives owners and leadership a consistent view of the forecast. Through our expanded delivery resources we can also provide Primavera P6 integrated master scheduling, schedule risk analysis, design-stage cost estimating, value engineering and constructability reviews, and change-order management. See project controls consulting.

Commissioning and turnover

We align installation, commissioning, correlation and acceptance activities, documentation, and training with suppliers, contractors, commissioning specialists, and the owner's operations and test teams, and track open items through owner acceptance and handover.

Representative projects

Client and project names are confidential. Figures are rounded.

$1B+ advanced high-altitude and hypersonic test facility

Greenfield advanced engine test facility. Albers served as the owner's representative, providing program controls and senior client coordination. Status: completed.

Aircraft engine test stand modernization program

Multi-hundred-million-dollar, multi-year program to add new test capabilities and modernize existing aircraft engine test stands, test facilities, and site infrastructure across multiple campuses, including a public-private partnership. Test capabilities include high-altitude, turboshaft and propeller, compressor, and hybrid-electric testing. Albers led requirements capture and business-case development, supported board approval, and provided owner's representation through execution. As the owner's integrator, Albers developed an alternative procurement strategy that separated test-equipment design and construction from facility infrastructure and broadened the pool of qualified vendors, reducing project cost and shifting risk to the supply chain. The program also included utility service upgrades and the demolition of obsolete 1940s structures.

$500M+ precision aviation manufacturing site modernization

Albers served as the owner's representative for the modernization of roughly 850,000 sf of manufacturing space into modern precision aviation manufacturing facilities, labs, and offices, with 1.3M+ sf of obsolete structures removed. The site was divided into independent facilities, including automated manufacturing, a central utility plant, an effluent waste plant, and research and development space. The engagement was complemented by David Gray's earlier in-house leadership experience on the program. Status: completed. View the case study.

$200M+ highly automated manufacturing facility

Owner-side planning and delivery support for a greenfield, highly automated factory, integrating building infrastructure, production equipment, utilities, schedule, and construction workstreams, from business case and site selection through preconstruction. Status: completed.

High-automation manufacturing annex

Owner's representative for a 60,000 sf high-automation manufacturing addition with special-process areas, clean rooms, laboratories, a new substation and cooling tower, and exterior process gas and chemical storage. Albers led space programming, design-firm selection, bidding and contractor selection, and worked with the owner's manufacturing team to validate requirements and support the selection and installation of automated production-line and laboratory equipment.

Operating-plant utility and infrastructure upgrades

Project management for utility modernization inside an operating manufacturing campus: steam boiler replacement, central compressed air, secondary natural-gas power generation, fuel farm replacement, cooling tower replacement serving critical labs and clean rooms, and wastewater treatment. Each was planned around continued operations and integrated into daily plant use. Status: completed. Albers also served as owner's representative for the demolition of a 400,000 sf office building while the attached plant stayed in operation.

Our broader advanced manufacturing experience includes owner-side project and construction-management resources for a multibillion-dollar greenfield EV manufacturing campus, and owner-side project management on a $500M+ multi-site explosives-manufacturing program across the United States and Canada. See all industrial and advanced manufacturing work.

Leadership experience from prior roles

Before or outside their current Albers engagements, our leaders also directed the following programs. These are listed as leadership experience, not Albers projects.

  • Ground-up $100M+ maintenance, repair and overhaul (MRO) facility.

  • $300M+ aerospace manufacturing facility expansion.

  • $50M+ engineering and test facility programs, including the rehabilitation of a previously idle test facility and the installation of multiple aero-engine test stands.

  • Program and project management for multiple aviation test cell facilities, and master planning for new facilities at a 10,000+ acre engine test operations site.

  • Executive leadership of a global capital portfolio spanning manufacturing, test, R&D, warehouse, and mission-critical facilities.

Why Albers

  • Test and aerospace depth. Owner's representative experience on engine test facilities, test stand modernization, and precision aviation manufacturing, not just general construction.

  • Owner-side only. We report to the owner, not the designer, contractor, or equipment vendor.

  • Equipment and facility integration. We have structured procurement so test equipment and facility work are contracted separately and integrated on the owner's behalf.

  • Built for operating sites. Tie-ins, outages, demolition, and utility work are planned around production and test schedules.

  • Controls that support decisions. Integrated cost, schedule, risk, and change reporting from business case through turnover.

  • National and international reach. Founded in 2014 and based in Indianapolis, Albers has delivered work nationally and internationally, including facility evaluations and plant programs across the United States, Canada, and Mexico.

Leadership on these programs

  • John E. Albers Jr., AIA, NCARB, LEED AP, CEO & Principal: licensed architect who founded Albers in 2014; owner's representative and program director on the firm's engine test facility and aviation manufacturing modernization programs.

  • David Gray, Principal: project principal for the firm's full owner's representative services on the high-altitude test facility; earlier in-house executive leadership of aerospace manufacturing, MRO, and test facility programs.

  • Nick Osborn, Project Director: mechanical engineer who served as project director on the engine test stand modernization and the hypersonic test facility, and as senior project manager on the manufacturing site modernization, the high-automation annex, and plant utility upgrades.

  • Jason D., Project Director: architect licensed in 15+ states, with manufacturing, government, and institutional project experience from schematic design through construction administration.

Meet Our Leadership

Frequently asked questions

What does an owner's representative do on a turbine or engine test facility project?

An owner's representative acts on the owner's behalf from requirements and business case through acceptance. On test facilities that means defining test capabilities and facility requirements, procuring and coordinating the design, construction, and test-equipment teams, managing the interfaces between them, controlling cost, schedule, and change, and coordinating commissioning and handover to the test team.

Can Albers coordinate owner-furnished test equipment with facility construction?

Yes. We coordinate vendor data, installation, utility, and access requirements, and track equipment milestones against the construction schedule. On an aircraft engine test program we developed a procurement strategy that contracted test-equipment design and construction separately from facility infrastructure, with Albers acting as the owner's integrator.

Do you work inside operating plants, test sites, and MRO facilities?

Yes. Much of our work is inside active facilities, including utility upgrades, test stand modernization, and demolition next to an operating plant. We plan access, shutdowns, tie-ins, and sequencing around production and test schedules. Our leaders also bring prior-role experience delivering a ground-up MRO facility.

When should we engage an owner's representative?

As early as possible. Our most effective engagements begin at requirements capture and business-case development, when test capabilities, equipment strategy, utilities, and phasing are still open and board approval is being sought.

Where does Albers work?

Albers is based in Indianapolis and supports owners nationwide. Our work has also included facility evaluations and plant programs in Canada and Mexico.

Discuss your test, MRO, or manufacturing project

Tell us about the facility, the equipment involved, your project stage, and where your team needs owner-side support.